Ir. Abd Rani Bin Ahmad

Managing Director

 10 April 1958 l  Phone: 03 – 6277 4695 /96 (Office) This email address is being protected from spambots. You need JavaScript enabled to view it.

 

 

 

 

 

 

 

Academic and Profesional Qualification  

Post Grad Dip Building Services Engineering (Glasgow) (UK) 

BSc. Mechanical Engineering (Brighton) (CNAA) (UK) 

Member of The Institution of Engineers, Malaysia  

Registered Professional Engineer with The Board of Engineers Malaysia

  

 Professional Experience 

Jan 2004 – To Date

 

:

MEGA JATI CONSULT SDN. BHD.

Mechanical Director

 Project Involve:

a)    University Sains Malaysia (USM) – Bangunan / Peralatan HUSM Di Kubang Kerian, Kelantan.

b)    Hospital Rompin, Pahang

c)    Cadangan Blok Wanita dan Kanak-Kanak dan Pusat Kardiologi, Hospital Raja Permaisuri Bainun, Ipoh Perak.

d)    Merekabentuk, Membina, Menyiapkan dan Menguji terima Klinik Kesihatan 2, Bandar Batu Pahat, Johor

e)    Operating Theater and CSSD, Hospital Kemaman Terengganu

 

Jan 2001 – Dec 2003

:

TUNAS SELATAN CONSORTIUM SDN BHD.

Assistant Construction Director 

Design and Built Contractor for 620 beds Hospital and College of Allied Health Science at Sungai Buluh, Selangor 

Reporting to Project Director on Design and Construction Progress 

Leading a team of four (4) senior constructions managers, ten (10) construction engineers and supporting staff for construction management of the main hospital block, college, trainee hostel and infrastructure

  

Jan 1998 – Jan 2001

:

MARAK UNGGUL SDN BHD SECONDED TO KTM BERHAD

Senior Manager

Leading a team of 1 manager and 4 executives. Responsible for setting up business unit dealing with disposal of unserviceable asset. 

Responsible for vendor selection and identification of unserviceable assets before disposal. Conducting survey enterprise-wide on the status of fixed assets and making recommendation to the top management.

  

Oct 1996 – Jan 1998

:

PENGURUSAN LANTAS SDN BHD

Construction Manager 

Pengurusan Lantas Sdn Bhd was awarded a contract by KLIA Bhd. To manage construction of 4 complexes.

They are: -

1.    Engineering Complex

2.    Custom Complex

3.    Automated Warehouse

4.    Cargo Decompression Chambers

 

The team leader was a Construction General Manager, assisted by one Senior Planner and four Construction Managers. The total construction cost was RM 140 mil.

 

Responsible for liaison with approval authorities like Jabatan Kilang dan Jentera, Jabatan Bomba, Jabatan Telekom, Sepang District Office etc. to ensure system were designed, installed, test and commissioned according to the specific standard and code of practice.

 

Sept 1995 – Oct 1996

:

PENGURUSAN LRT SDN BHD

Senior Mechanical Engineer 

The main responsibility of the team was to manage the design, vendor selection, installation, testing and commissioning of all mechanical and electrical system for PUTRA’s station including five underground stations.

  

Mar 1995 – Sept 1995

:

JABATAN KERJA RAYA

Residence Mechanical Engineer 

To manage the installtion of Building Services and Medical Sysem at Clinical and Diagnostic Laboratory at the University Hospital Petaling Jaya 

Responsible for the installation, testing and commissioning of system like the chiller system, piped medical gas system, boilers, firefighting system and Air-cond and mechanical ventilation system

 

Jan 1990 – Mar 1993

:

JABATAN KERJA RAYA

Residence Mechanical Engineer 

To manage the installation of Building and Medical Services at the Central Services Block Penang General Hospital 

Presented a conceptual paper on the management of installation of Building Services in General Hospital to the Director General of Public Works Dept of Malaysia

 

Aug 1984 to Jan 1990

:

PENANG PWD

State Mechanical Engineer 

Responsible for all aspect of maintenance and installation of building services in all government building. Conduct site supervision works, resolved all interfacing issues. 

Liaison with all relevant authorities to ensure works complied with the standard and code of practice. 

Prepare financial and physical progress of works and reporting to the client.